Location: Sunnyside Academy, Middlesbrough

Date Undertaken: July – August 2018

Scope of Work

The plant room heating and hot water upgrade involved replacing three floor standing atmospheric boilers and horizontal vented calorifiers with three high efficiency condensing boilers on a cascade system with a unvented hot water cylinder. All pipe work was renewed with new associated equipment such as pumps, valves, air/dirt separator, pressurisation unit and expansion vessel.

The controls system was also upgraded with a new panel and controls devices to operate school remotely through BMS controls.