Location: Vimy 101, Catterick Garrison
Client: Tom Willoughby
Date Undertaken: March 2018
TheĀ Project
The plant room heating and hot water upgrade involved replacing three floor standing atmospheric boilers and horizontal vented calorifiers with three high efficiency condensing boilers on a cascade system with a unvented hot water cylinder. All pipe work was renewed with new associated equipment such as pumps, valves, air/dirt separator, pressurisation unit and expansion vessel.
The controls system was also upgraded with a new panel and controls devices to operate school remotely through BMS controls.