CASE STUDY
STOKESELY LEISURE CENTRE AIR HANDLING UNIT & DUCTWORK INSTALLATION
CLIENT
NORTH YORKSHIRE COUNCIL
TYPE OF PROJECT
PRE-DESIGNED AIR HANDLING UNIT AND DUCTWORK INSTALLATION
PROJECT COMPLETED
SEPTEMBER 2025
In 2025, we delivered a coordinated mechanical, electrical and BMS installation at Stokesely Leisure Centre. Centred on the supply and integration of a bespoke Mansfield Pollard AHU, this project provided a robust, compliant and fully integrated air handling and control solution to support the operational requirements of the leisure centre.
Mechanical works included installation of the custom-built AHU, heating coil pipework modifications, minor ductwork insulation adjustments, and full testing and commissioning.
 
Electrical works comprised plantroom containment upgrades, uprated SWA power supplies, replacement of the existing plant distribution board with integrated surge protection, and provision of dedicated local isolation for the AHU.
 
BMS works included a Trend DDC-based control system with a Westminster Controls-manufactured panel, field-mounted controls, panel-mounted display, Type 2 surge protection, and updated BMS graphics.
CHECK OUT OUR LATEST NEWS
OUR ACCREDITATIONS
  • Gas Safe
  • FGas Certified
  • CHAS Elite
  • ISO9001
  • SSIP
  • EA
  • ROSPA Gold Award
  • Water Safe
  • BAFE
  • Constructionline
  • NIC EIC
  • WIAPS
  • ECA
PROUD SUPPORTERS OF THE TEESSIDE CHARITY
THE BEST COMPANY TO WORK FOR AND TO WORK WITH
Unit 10C Perry Avenue
Teesside Industrial Estate
Stockton-on-Tees
TS17 9LN
SIGN UP TO OUR MAILING LIST