CASE STUDY
THIRSK HIGHWAYS AIR CONDITIONING INSTALLATION
CLIENT
NORTH YORKSHIRE COUNCIL
TYPE OF PROJECT
DESIGN AND BUILD A/C INSTALLATION
PROJECT COMPLETED
APRIL 2026
At JH-ME, we completed the installation of new air conditioning systems at Thirsk Highways Depot to serve the General Office and Meeting Room areas. This was a design and build project which delivered reliable, complaint and efficient climate control throughout the building with minimal disruption to the operational requirements of the building.
Technical Details
 
The works included six Mitsubishi SLZ ceiling‑mounted cassette units served by three high‑efficiency inverter‑driven outdoor condensers, sized in line with calculated heat loads to ensure effective performance and energy efficiency. A separate Mitsubishi wall‑mounted split system was installed within the meeting room to provide independent temperature control.
 
The project also incorporated refrigeration‑grade pipework with Armaflex insulation, pumped condensate drainage, wired controllers, system interlocks and local electrical isolation.
 
All systems were fully vacuum‑tested, charged with R32 refrigerant, commissioned and handed over to deliver reliable, compliant and efficient climate control throughout the building.
CHECK OUT OUR LATEST NEWS
OUR ACCREDITATIONS
  • Constructionline
  • SSIP
  • ROSPA Gold Award
  • WIAPS
  • Water Safe
  • ISO9001
  • Gas Safe
  • EA
  • BAFE
  • CHAS Elite
  • NIC EIC
  • ECA
  • FGas Certified
PROUD SUPPORTERS OF THE TEESSIDE CHARITY
THE BEST COMPANY TO WORK FOR AND TO WORK WITH
Unit 10C Perry Avenue
Teesside Industrial Estate
Stockton-on-Tees
TS17 9LN
SIGN UP TO OUR MAILING LIST